Débloquez ce profil candidat
Inscrivez-vous gratuitement comme recruteur pour voir le CV complet, les coordonnées et contacter ce candidat.
Competences
Experience
Irrigation Installation Technician
Exotic Green Power Enterprise Ltd
2026-08 - 2026-09
Supervised and guided community members during the installation of a 10‑hectare drip irrigation system at Lunchinze Irrigation Scheme. Supported the installation of drip lines, solar pumps, storage tanks and the water reticulation network. Troubleshot and repaired the existing irrigation system and provided hands‑on training to community members on operation and maintenance.
Hydrogeological Technician
JP Consultants Limited
2022-06 - 2022-09
Supervised borehole drilling, pump testing, civil works and hand‑pump installation for a UNICEF‑funded project in Chongwe District. Coordinated technical project operations, including planning, design, work estimates and operational monitoring. Contributed to the development of maintenance, environmental, health and safety, and stores‑management procedures.
Regional Biogas Technician
SNV – Netherlands Development Organisation
2019-08 - 2019-12
Supported the National Biogas Support Unit in biodigester construction, training, capacity building and quality assurance activities. Prepared activity calendars, assessed training needs and delivered technical training for biogas construction enterprises and stakeholders. Conducted field visits and on‑the‑job training for masons, supervisors and clients, providing guidance on construction methods and technical drawings.
Water Engineering Technologist
Zulu Burrow Development Consultants Limited
2010-01 - 2017-12
Supervised installation of manual and electronic river‑gauging stations and rain gauges across major Zambian catchments, supporting water resources monitoring for WARMA. Oversaw staff‑gauge installation, river‑flow measurements and contributed to dam‑site selection for the Chilinga Mini‑Hydro Power Station. Conducted socio‑economic surveys and community awareness activities to support project implementation.
Langues
English
fluent
Derniere mise a jour: il y a 9 heures